About the Project

Loyalist Plaza and the boardwalk

Waterfront Development is redeveloping the boardwalk, Market Slip and Loyalist Plaza. To redevelop the boardwalk area the design process will involve three steps:

  1. Public Consultation and Design Ideas;
  2. Public Consultation and Workshops on Design Ideas; and
  3. Public Consultation and Presentation of Draft Design

The design is anticipated to be complete in 2013, finalized in 2014 and the redevelopment will begin in 2015.

Studies completed over the years emphasize the importance of the waterfront in Saint John. These reports include valuable considerations for redevelopment efforts that will be taken into account during the design process. These reports include: